BHP BILLITON PRODUCTION REPORT FOR THE QUARTER END21 Oct 2004
BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2004          
BHP BILLITON PLC                                                                
JSE SHARE CODE: BIL                                                             
ISIN: GB0000566504                                                              
BHP Billiton today released its production report for the quarter ended 30      
September 2004.  Unless otherwise stated, production volumes refer to BHP       
Billiton share.                                                                 
*    Record quarterly aluminium production of 339 thousand tonnes.              
*    Record quarterly manganese ore production of 1.4 million tonnes (100%      
     basis).                                                                    
*    Continued ramp up of operating capacity at Western Australian Iron Ore     
operations, with record quarterly production of 23.5 million tonnes (100%  
     basis).                                                                    
*    First shipment of LNG from the newly commissioned North West Shelf         
     (Australia) fourth train.                                                  
-    Total Petroleum Products - Total production for the September 2004 quarter 
     was 27.6 million barrels of oil equivalent, 14 per cent lower than the     
     September 2003 quarter and nine per cent lower than the June 2004 quarter. 
-    Oil and Condensate - Production for the September 2004 quarter was 12.4    
million barrels, 20 per cent lower than the 15.5 million barrels produced  
     in the September 2003 quarter. Planned maintenance at Liverpool Bay (UK)   
     and Bruce (UK) resulted in shutdowns of 14 and 54 days respectively.       
     Production was also lower due to natural field decline at Bass Strait,     
Laminaria, Griffin, North West Shelf (all Australia) and Liverpool Bay and 
     the divestment in February 2004 of our producing assets in Bolivia. This   
     was partly offset by new production from Ohanet (Algeria) and Boris North  
     (USA) which were commissioned in October 2003 and September 2003           
respectively. Production for the quarter was seven per cent lower than the 
     13.3 million barrels produced in the June 2004 quarter due to maintenance  
     shutdowns at Liverpool Bay and Bruce as well as natural decline across the 
     portfolio. BHP Billiton`s share of Ohanet production was also lower than   
the June 2004 quarter where under the terms of the risk sharing contractual
     agreement higher prices result in lower production entitlements.  This was 
     partly offset by higher production from Bass Strait and North West Shelf   
     due to higher downtime in the previous quarter.                            
-    Natural Gas - Production for the September 2004 quarter was 75.9 billion   
     cubic feet, 11 per cent lower than the 85.2 billion cubic feet produced in 
     the September 2003 quarter. This was due to planned maintenance at         
     Liverpool Bay and Bruce plus subsequent production issues on restart of the
Liverpool Bay gas plant. This was partially offset by increased production 
     to support higher demand at Bass Strait and North West Shelf LNG.          
     Production for the quarter was 11 per cent lower than the June 2004 quarter
     due to maintenance shutdowns at Liverpool Bay and Bruce and subsequent     
restart issues at Liverpool Bay. This was partially offset by higher       
     downtime at North West Shelf in the previous quarter and increased         
     production due to demand for North West Shelf LNG.                         
-    Alumina - Production for the September 2004 quarter of 1.0 million tonnes  
was five per cent lower than the September 2003 quarter and six per cent   
     lower than the June 2004 quarter.  This mainly reflects scheduled and      
     unscheduled calciner outages leading to increased stockpiling of hydrate at
     Worsley (Australia) and lower production at Alumar (Brazil) due to         
scheduled maintenance carried out in July 2004.                            
-    Aluminium - Production for the September 2004 quarter was a record 339,000 
     tonnes, 20 per cent higher than the September 2003 quarter, mainly         
     reflecting the ramp up of production from the Mozal 2 (Mozambique) and     
Hillside 3 (South Africa) expansions, which reached full commissioning in  
     August 2003 and December 2003 respectively.  Production was also impacted  
     by an electrical outage at Alumar in the September 2003 quarter.           
     Production was two per cent higher than the June 2004 quarter mainly due to
increased production from Hillside and Mozal.                              
-    Copper -  Production for the September 2004 quarter was 248,800 tonnes, 16 
     per cent higher than the September 2003 quarter. This mainly reflects      
     restoration of full capacity at Escondida (Chile) and Tintaya (Peru) and   
Antamina`s (Peru) return to normal mine plan following the removal of      
     lakebed sediments.  This was partly offset by lower head grade at Cerro    
     Colorado (Chile) and sale of the Group`s interest in Highland Valley Copper
     (Canada) in January 2004.  Production was nine per cent lower than the June
2004 quarter, mainly reflecting lower head grades at Escondida, Tintaya and
     Cerro Colorado.                                                            
-    Silver - Production for the September 2004 quarter of 11.8 million ounces  
     was 11 per cent higher than the September 2003 quarter and six per cent    
higher than the June 2004 quarter. This mainly reflects record quarterly   
     mill throughput at Cannington (Australia) resulting from a continuing      
     debottlenecking program.                                                   
-    Iron Ore - Production for the September 2004 quarter was a record 22.5     
million tonnes, eight per cent higher than the September 2003 quarter and  
     ten per cent higher than the June 2004 quarter.  The increase reflects     
     additional capacity following the completion of the Area C, Products and   
     Capacity Expansion and Accelerated Expansion projects at Western Australian
Iron Ore, underpinned by strong customer demand for iron ore products.     
-    Metallurgical Coal - Production for the September 2004 quarter was 9.3     
     million tonnes, two per cent higher than the September 2003 quarter.  This 
     mainly reflects record production at Queensland Coal (Australia)           
underpinned by strong customer demand for metallurgical coal.  This was    
     partly offset by lower production from Illawarra Coal (Australia), largely 
     due to a longwall changeout at Appin and Elouera and industrial activity at
     Elouera.  Production was in line with the June 2004 quarter.               
-    Manganese ore - Ore production for the September 2004 quarter was a record 
     1.4 million tonnes, 20 per cent higher than the September 2003 quarter and 
     three percent higher than the June 2004 quarter.  This reflects our ability
     to increase production, mainly at our Australian operations to meet strong 
customer demand in all markets, particularly China, Japan and Europe.      
-    Manganese alloys - Production for the September quarter of 195,000 tonnes  
     was 33 per cent higher than the September 2003 quarter.  Production in the 
     September 2003 quarter was affected by a fire in the Metalloy`s South plant
in South Africa.  Production was in line with the June 2004 quarter.       
-    Hot briquetted iron - Production remains suspended at the Boodarie Iron    
     plant (Australia) following a gas explosion in May 2004.  A number of      
     investigations into the incident are continuing.                           
-    Diamonds - Production of 1.0 million carats at Ekati was 36 per cent lower 
     than the September 2003 quarter and 19 per cent lower than the June 2004   
     quarter.  This decrease primarily reflects processing of lower grade ore in
     the September 2004 quarter after mining of a high grade zone in the Koala  
pipe was completed in the June 2004 quarter.                               
-    Energy Coal - Production for the September 2004 quarter was 23.2 million   
     tonnes, 10 per cent higher than the September 2003 quarter.  This primarily
     reflects the ramp up of production at Mt Arthur Coal (Australia) and       
improved operational performance at Ingwe (South Africa).  September 2003  
     quarter production was also impacted by a longwall move at New Mexico      
     Coal`s (USA) San Juan mine.  Production was eight per cent higher than the 
     June 2004 quarter, primarily reflecting improved operational performance at
Ingwe.   Production in the June 2004 quarter was also impacted by two      
     planned major dragline outages at the Navajo mine and a longwall move at   
     the San Juan mine at New Mexico Coal.                                      
-    Nickel - Production for the September 2004 quarter was 19,600 tonnes, five 
per cent lower than the September 2003 quarter.  This mainly reflects lower
     production at Cerro Matoso (Colombia) due to ore variations and            
     unseasonably heavy rain, along with conversion of work in process          
     inventories to finished goods at Yabulu (Australia) in the September 2003  
quarter.  Production was in line with the June 2004 quarter.               
BHP BILLITON PRODUCTION                                                         
SUMMARY                                                                         
                               QUARTER ENDED      QUARTER ENDED   % CHANGE      
SEP   SEP     
                                                                 Q04   Q04      
                             SEPT   JUNE    SEPT   SEPT    SEPT    vs    vs     
                             2003   2004    2004   2004    2003   SEP   JUN     
Q03   Q04      
PETROLEUM                                                                       
 Crude oil and   (`000     15,512 13,297  12,366 12,366  15,512  -20%   -7%     
 condensate      bbl)                                                           
Natural gas     (bcf)      85.19  85.11   75.85  75.85   85.19  -11%  -11%     
 LPG             (`000     199.33 235.86  214.93 214.93  199.33    8%   -9%     
                tonnes)                                                         
 Ethane          (`000      27.32  25.14   27.75  27.75   27.32    2%   10%     
tonnes)                                                         
 Total           (million   32.13  30.32   27.63  27.63   32.13  -14%   -9%     
 Petroleum       boe)                                                           
 Products                                                                       
ALUMINIUM                                                                       
 Alumina         (`000      1,053  1,059   1,000  1,000   1,053   -5%   -6%     
                tonnes)                                                         
 Aluminium       (`000        282    333     339    339     282   20%    2%     
tonnes)                                                         
BASE METALS                                                                     
 Copper          (`000      214.5  272.6   248.8  248.8   214.5   16%   -9%     
                tonnes)                                                         
Lead            (tonnes)  59,364 64,472  64,910 64,910  59,364    9%    1%     
 Zinc            (tonnes)  49,094 29,038  23,851 23,851  49,094  -51%  -18%     
 Gold            (ounces)  29,170 31,145  30,132 30,132  29,170    3%   -3%     
 Silver          (`000     10,596 11,053  11,769 11,769  10,596   11%    6%     
ounces)                                                         
 Molybdenum      (tonnes)     325    240     323    323     325   -1%   35%     
CARBON STEEL                                                                    
MATERIALS                                                                       
Iron ore        (`000     20,870 20,537  22,545 22,545  20,870    8%   10%     
                tonnes)                                                         
 Metallurgical   (`000      9,099  9,284   9,277  9,277   9,099    2%    0%     
 coal            tonnes)                                                        
Manganese ores  (`000      1,153  1,337   1,379  1,379   1,153   20%    3%     
                tonnes)                                                         
 Manganese       (`000        147    203     195    195     147   33%   -4%     
 alloys          tonnes)                                                        
Hot briquetted  (`000        496    294       -      -     496 -100% -100%     
 iron            tonnes)                                                        
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
Diamonds        (`000      1,552  1,211     986    986   1,552  -36%  -19%     
                carats)                                                         
ENERGY COAL                                                                     
 Energy coal     (`000     21,134 21,494  23,245 23,245  21,134   10%    8%     
tonnes)                                                         
STAINLESS STEEL                                                                 
MATERIALS                                                                       
 Nickel          (`000       20.6   19.9    19.6   19.6    20.6   -5%   -2%     
tonnes)                                                         
 Ferrochrome     (`000        227    264     265    265     227   17%    0%     
                tonnes)                                                         
BHP BILLITON ATTRIBUTABLE                                                       
PRODUCTION                                                                      
                                      QUARTER ENDED            QUARTER ENDED    
                  BHP         SEPT   DEC  MARCH   JUNE   SEPT    SEPT  SEPT     
                 Billiton                                                       
Interest    2003  2003   2004   2004   2004    2004  2003     
PETROLEUM                                                                       
Production                                                                      
 Crude oil and    (000      15,512 14,877 14,341 13,297 12,366  12,366 15,512   
condensate       bbl)                                                          
 Natural gas      (bcf)      85.19 77.57  76.47  85.11  75.85   75.85 85.19     
 LPG              (`000     199.33 200.51 217.83 235.86 214.93  214.93 199.33   
                 tonnes)                                                        
Ethane           (`000      27.32 25.25  16.59  25.14  27.75   27.75 27.32     
                 tonnes)                                                        
 Total Petroleum  (million   32.13 30.24  29.78  30.32  27.63   27.63 32.13     
 Products         boe)                                                          
ALUMINIUM                                                                       
ALUMINA                                                                         
Production (`000                                                                
tonnes)                                                                         
Worsley          86%          699   700    704    696    663     663   699     
 Suriname         45%          227   230    228    233    223     223   227     
 Alumar           36%          127   120    130    130    114     114   127     
 Total                       1,053 1,050  1,062  1,059  1,000   1,000 1,053     
ALUMINIUM                                                                       
Production (`000                                                                
tonnes)                                                                         
 Hillside         100%         135   151    169    167    173     173   135     
Bayside          100%          47    46     45     46     46      46    47     
 Alumar           46.3%         31    36     44     45     44      44    31     
 Valesul          45.5%         11    11     11     11     11      11    11     
 Mozal            47%           58    64     64     64     65      65    58     
Total                         282   308    333    333    339     339   282     
BASE METALS (a)                                                                 
COPPER                                                                          
Payable metal in                                                                
concentrate (`000 tonnes)                                                       
 Escondida        57.5%      115.9 109.1  130.8  159.1  142.5   142.5 115.9     
 Tintaya (b)      100%           -  15.0   22.9   19.6   14.6    14.6     -     
 Antamina         33.8%       16.9  20.5   24.6   29.9   29.9    29.9  16.9     
Highland Valley  33.6%       14.1  14.2      -      -      -       -  14.1     
 Copper (c)                                                                     
 Selbaie (d)      100%         1.6   1.8    0.8      -      -       -   1.6     
 Total                       148.5 160.6  179.1  208.6  187.0   187.0 148.5     
Cathode (`000                                                                   
tonnes)                                                                         
 Escondida        57.5%       21.4  21.8   21.7   21.8   21.9    21.9  21.4     
 Cerro Colorado   100%        33.1  33.0   28.1   31.3   28.3    28.3  33.1     
Tintaya (b)      100%         9.0   9.0    9.3    8.7    9.3     9.3   9.0     
 Pinto Valley     100%         2.5   2.4    2.4    2.2    2.3     2.3   2.5     
 Total                        66.0  66.2   61.5   64.0   61.8    61.8  66.0     
LEAD                                                                            
Payable metal in                                                                
concentrate (tonnes)                                                            
 Cannington       100%      59,364 55,211 70,838 64,472 64,910  64,910 59,364   
 Total                      59,364 55,211 70,838 64,472 64,910  64,910 59,364   
ZINC                                                                            
Payable metal in                                                                
concentate                                                                      
(tonnes)                                                                        
Cannington       100%      14,850 11,692 13,589 13,493 10,968  10,968 14,850   
 Antamina         33.8%     27,933 27,026 19,099 15,545 12,883  12,883 27,933   
 Selbaie (d)      100%       6,311 7,194  2,506      -      -       - 6,311     
 Total                      49,094 45,912 35,194 29,038 23,851  23,851 49,094   
Refer footnotes                                                                
 on page 4.                                                                     
BASE METALS                                                                     
(continued)                                                                     
GOLD                                                                            
Payable metal in                                                                
concentrate (ounces)                                                            
 Escondida        57.5%     25,016 24,833 27,492 26,044 25,370  25,370 25,016   
Tintaya (b)      100%           - 2,658  4,009  5,101  4,762   4,762     -     
 Selbaie (d)      100%       3,129 3,428  1,413      -      -       - 3,129     
 Highland Valley  33.6%      1,025 1,166      -      -      -       - 1,025     
 Copper (c)                                                                     
Total                      29,170 32,085 32,914 31,145 30,132  30,132 29,170   
SILVER                                                                          
Payable metal in                                                                
concentrate (`000 ounces)                                                       
Cannington       100%       9,177 8,287 10,485  9,471 10,339  10,339 9,177     
 Escondida        57.5%        561   550    614    720    604     604   561     
 Antamina         33.8%        435   494    588    662    692     692   435     
 Tintaya (b)      100.0%         -   170    239    200    134     134     -     
Highland Valley  33.6%        160   163      -      -      -       -   160     
 Copper (c)                                                                     
 Selbaie (d)      100%         263   316    138      -      -       -   263     
 Total                      10,596 9,980 12,064 11,053 11,769  11,769 10,596    
MOLYBDENUM                                                                      
Payable metal in                                                                
concentrate (tonnes)                                                            
 Antamina         33.8%         25    20     81    240    323     323    25     
Highland Valley  33.6%        300   270      -      -      -       -   300     
 Copper (c)                                                                     
 Total                         325   290     81    240    323     323   325     
CARBON STEEL                                                                    
MATERIALS                                                                       
IRON ORE (e)                                                                    
Production (`000                                                                
tonnes)                                                                         
Mt Newman Joint  85%        6,639 6,707  6,031  5,084  6,157   6,157 6,639     
 Venture                                                                        
 Goldsworthy      85%        1,633 1,477  1,348  1,386  1,038   1,038 1,633     
 Joint Venture                                                                  
Area C Joint     85%          341 1,048  1,768  2,519  2,990   2,990   341     
 Venture (f)                                                                    
 Yandi Joint      85%        8,679 9,005  8,429  8,046  8,767   8,767 8,679     
 Venture                                                                        
Jimblebar        100%       1,622 1,520  1,647  1,566  1,675   1,675 1,622     
 Samarco          50%        1,956 1,971  1,862  1,936  1,918   1,918 1,956     
 Total                      20,870 21,728 21,085 20,537 22,545  22,545 20,870   
METALLURGICAL                                                                   
COAL (g)                                                                        
Production (`000                                                                
tonnes)                                                                         
 BMA              50%        5,591 5,395  5,263  6,285  6,231   6,231 5,591     
BHP Mitsui Coal  80%        1,926 1,591  1,811  1,653  1,748   1,748 1,926     
 (h)                                                                            
 Illawarra        100%       1,582 1,459  1,458  1,346  1,298   1,298 1,582     
 Total                       9,099 8,445  8,532  9,284  9,277   9,277 9,099     
MANGANESE ORES                                                                  
Saleable                                                                        
production (`000                                                                
tonnes)                                                                         
South Africa (i) 60%          600   651    604    647    632     632   600     
 Australia (i)    60%          553   548    660    690    747     747   553     
 Total                       1,153 1,199  1,264  1,337  1,379   1,379 1,153     
MANGANESE ALLOYS                                                                
Saleable                                                                        
production (`000                                                                
tonnes)                                                                         
 South Africa (i) 60%           93   122    116    131    121     121    93     
Australia (i)    60%           54    61     63     72     74      74    54     
 Total                         147   183    179    203    195     195   147     
 Refer footnotes                                                                
 on page 4.                                                                     
CARBON STEEL MATERIALS                                                          
(cont`d)                                                                        
HOT BRIQUETTED                                                                  
IRON                                                                            
Production (`000                                                                
tonnes)                                                                         
 Boodarie(TM)     100%         496   527    399    294      -       -   496     
 Iron (j)                                                                       
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
DIAMONDS                                                                        
Production (`000                                                                
carats)                                                                         
 Ekati(TM)        80%        1,552 1,704  1,015  1,211    986     986 1,552     
ENERGY COAL                                                                     
Production (`000                                                                
tonnes)                                                                         
 South Africa     100%      13,782 13,472 13,231 13,768 14,588  14,588 13,782   
 USA              100%       3,560 2,829  3,687  3,154  3,899   3,899 3,560     
 Australia        100%       1,756 2,054  2,318  2,590  2,595   2,595 1,756     
Colombia         33%        2,036 1,623  2,043  1,982  2,163   2,163 2,036     
 Total                      21,134 19,978 21,279 21,494 23,245  23,245 21,134   
STAINLESS STEEL                                                                 
MATERIALS                                                                       
NICKEL                                                                          
Production (`000                                                                
tonnes)                                                                         
 CMSA             99.8%       12.4  12.2   12.5   12.0   11.9    11.9  12.4     
Yabulu           100%         8.2   7.8    8.7    7.9    7.7     7.7   8.2     
 Total                        20.6  20.0   21.2   19.9   19.6    19.6  20.6     
FERROCHROME                                                                     
Saleable                                                                        
production (`000                                                                
tonnes)                                                                         
 South Africa (i) 60%          227   269    266    264    265     265   227     
(a) Metal production is reported on the basis of payable metal.                 
(b) Sulphide production at Tintaya was temporarily reduced in January 2002 due  
to weak market conditions, and recommenced during August 2003.                  
(c) BHP Billiton sold its interest in Highland Valley Copper with effect from   
January 3, 2004.                                                                
(d) Production at Selbaie ceased in February 2004, in accordance with mine      
plan.Shipments ceased in May 2004.                                              
(e) Iron ore production is reported on a wet tonnes basis.                      
(f) Production commenced in May 2003.                                           
(g) Coal production is reported on the basis of saleable product.Production     
figures include some thermal coal.                                              
(h) Shown on 100% basis before 20% outside equity interest.                     
(i) Shown on 100% basis.BHP Billiton interest in saleable production is 60%.    
(j) Production was suspended at Boodarie Iron following a gas explosion in May  
2004.                                                                           
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED              QUARTER            
                                                             ENDED              
                          SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
PETROLEUM                                                                       
BHP Billiton attributable                                                       
production unless otherwise                                                     
stated.                                                                         
CRUDE OIL AND                                                                   
CONDENSATE (`000                                                                
barrels)                                                                        
 Bass Strait             5,872  5,333 5,174  4,641 4,835   4,835  5,872         
North West Shelf -     1,491  1,204 1,352  1,367 1,330   1,330  1,491          
 condensate                                                                     
 North West Shelf -     1,604  1,675 1,519  1,357 1,475   1,475  1,604          
 Wanaea/Cossack                                                                 
Laminaria               1,151    966   928    803   597     597  1,151         
 Griffin                   742    563   380    585   414     414    742         
 Pakistan                   53     53    50     49    50      50     53         
 Typhoon/Boris           1,214  1,605 1,457  1,462 1,461   1,461  1,214         
(a)                                                                            
 Americas                  608    586   332    213   181     181    608         
 Liverpool Bay           2,324  2,061 1,926  1,788 1,344   1,344  2,324         
 Bruce/Keith               453    387   423    388   121     121    453         
Algeria (b)                 -    444   800    644   558     558      -         
 Total                   15,512 14,877 14,341 13,297 12,366  12,366 15,512      
NATURAL GAS (billion                                                            
cubic feet)                                                                     
Bass Strait             33.04  23.86 24.95  34.62 35.61   35.61  33.04         
 North West               3.99   3.95  3.91   3.76  3.50    3.50   3.99         
 Shelf -                                                                        
 Domestic                                                                       
North West              16.74  14.93 13.74  15.43 17.78   17.78  16.74         
 Shelf - LNG                                                                    
 Griffin                  0.96   0.90  0.44   0.67  0.68    0.68   0.96         
 Pakistan                 7.86   7.83  7.51   7.10  7.69    7.69   7.86         
Typhoon/Boris            1.58   2.41  2.14   2.13  2.32    2.32   1.58         
 (a)                                                                            
 Americas                 3.25   3.73  2.60   2.75  1.99    1.99   3.25         
 Bruce                    8.77   8.52  9.27   8.29  2.23    2.23   8.77         
Keith                    0.11   0.08  0.17   0.20  0.03    0.03   0.11         
 Liverpool Bay            8.89  11.36 11.74  10.16  4.02    4.02   8.89         
 Total                   85.19  77.57 76.47  85.11 75.85   75.85  85.19         
LPG (`000                                                                       
tonnes)                                                                         
 Bass Strait             150.19 130.02 111.26 136.52 145.85  145.85 150.19      
 North West              34.21  28.11 29.59  32.95 34.66   34.66  34.21         
 Shelf                                                                          
Bruce                   14.12  17.71 18.40  18.64  6.63    6.63  14.12         
 Keith                    0.81   0.31  0.82   0.63  0.30    0.30   0.81         
 Algeria (b)                 -  24.36 57.76  47.12 27.49   27.49      -         
 Total                   199.33 200.51 217.83 235.86 214.93  214.93 199.33      
ETHANE (`000             27.32  25.25 16.59  25.14 27.75   27.75  27.32         
tonnes)                                                                         
TOTAL PETROLEUM         32.13  30.24 29.78  30.32 27.63   27.63  32.13          
PRODUCTS                                                                        
(million barrels of oil                                                         
equivalent) (c)                                                                 
(a) Boris commenced production in February 2003.                                
(b) Ohanet commenced production in October 2003.                                
(c) Total barrels of oil equivalent (boe) conversions based on thefollowing:    
     * 6000 scf of natural gas equals 1 boe                                     
     * 1 tonne of LPG equals 11.6 boe                                           
     * 1 tonne of ethane equals 4.4667 boe                                      
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                                  QUARTER ENDED              QUARTER            
                                                             ENDED              
SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
ALUMINIUM                                                                       
BHP Billiton attributable production                                            
and sales unless otherwise stated.                                              
(`000 tonnes)                                                                   
ALUMINA                                                                         
 Production                                                                     
Worsley,                  699    700   704    696   663     663    699         
 Australia                                                                      
 Paranam,                  227    230   228    233   223     223    227         
 Suriname                                                                       
Alumar, Brazil            127    120   130    130   114     114    127         
 Total                   1,053  1,050 1,062  1,059 1,000   1,000  1,053         
 Sales                                                                          
 Worsley,                  697    740   652    732   667     667    697         
Australia                                                                      
 Paranam,                  221    250   233    214   239     239    221         
 Suriname                                                                       
 Alumar, Brazil            120    128   144    111   129     129    120         
Total                   1,038  1,118 1,029  1,057 1,035   1,035  1,038         
ALUMINIUM                                                                       
 Production                                                                     
 Hillside,                 135    151   169    167   173     173    135         
South Africa                                                                   
 Bayside, South             47     46    45     46    46      46     47         
 Africa                                                                         
 Alumar, Brazil             31     36    44     45    44      44     31         
Valesul,                   11     11    11     11    11      11     11         
 Brazil                                                                         
 Mozal,                     58     64    64     64    65      65     58         
 Mozambique                                                                     
Total                     282    308   333    333   339     339    282         
 Sales                                                                          
 Hillside,                 134    145   176    171   155     155    134         
 South Africa                                                                   
Bayside, South             54     35    49     45    45      45     54         
 Africa                                                                         
 Alumar, Brazil             38     25    39     55    43      43     38         
 Valesul,                   11     12    11     12    12      12     11         
Brazil                                                                         
 Mozal,                     61     40    78     56    59      59     61         
 Mozambique                                                                     
 Total                     298    257   353    339   314     314    298         
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                                   QUARTER ENDED            QUARTER ENDED       
                          SEPT    DEC MARCH   JUNE   SEPT    SEPT    SEPT       
2003   2003  2004   2004   2004    2004    2003       
BASE METALS                                                                     
BHP Billiton attributable production and sales unless otherwise                 
stated.Metals production is payable metal unless otherwise stated.              
Escondida,                                                                      
Chile                                                                           
 Material mined (`000    69,342 82,909 83,640 95,757 100,466  100,466  69,342   
 (100%)         tonnes)                                                         
Sulphide ore   (`000    18,888 18,299 19,620 21,197 20,637  20,637  18,888     
 milled (100%)  tonnes)                                                         
 Average copper (%)      1.33%  1.31% 1.48%  1.61%  1.47%   1.47%   1.33%       
 grade                                                                          
Production ex  (`000    208.2  197.1 239.6  284.2  256.8   256.8   208.2       
 Mill (100%)    tonnes)                                                         
 Production                                                                     
 Payable copper (`000    115.9  109.1 130.8  159.1  142.5   142.5   115.9       
tonnes)                                                          
 Payable gold   (fine    25,016 24,833 27,492 26,044 25,370  25,370  25,016     
 concentrate    ounces)                                                         
 Copper cathode (`000     21.4   21.8  21.7   21.8   21.9    21.9    21.4       
(SXEW)         tonnes)                                                         
 Payable silver (`000      561    550   614    720    604     604     561       
 concentrate    ounces)                                                         
 Sales                                                                          
Payable copper (`000    116.2  114.8 127.3  150.4  140.0   140.0   116.2       
               tonnes)                                                          
 Payable gold   (fine    25,335 26,984 28,545 24,874 24,732  24,732  25,335     
 concentrate    ounces)                                                         
Copper cathode (`000     18.1   23.8  26.2   21.3   22.7    22.7    18.1       
 (SXEW)         tonnes)                                                         
 Payable silver (`000      574    634   612    683    582     582     574       
 concentrate    ounces)                                                         
Tintaya, Peru                                                                   
(a)                                                                             
 Material mined (`000    4,151 17,450 17,206 17,944 18,676  18,676   4,151      
               tonnes)                                                          
Ore milled     (`000        -  1,408 1,609  1,616  1,621   1,621       -       
               tonnes)                                                          
 Average copper (%)          -  1.38% 1.61%  1.45%  1.14%   1.14%       -       
 grade                                                                          
Production                                                                     
 Payable copper (`000        -   15.0  22.9   19.6   14.6    14.6       -       
               tonnes)                                                          
 Payable gold   (fine        -  2,658 4,009  5,101  4,762   4,762       -       
concentrate    ounces)                                                         
 Copper cathode (`000      9.0    9.0   9.3    8.7    9.3     9.3     9.0       
 (SXEW)         tonnes)                                                         
 Payable silver (`000        -    170   239    200    134     134       -       
concentrate    ounces)                                                         
 Sales                                                                          
 Payable copper (`000        -   10.6  23.1   20.6    5.7     5.7       -       
               tonnes)                                                          
Payable gold   (fine        -  3,086 4,372  4,100  1,219   1,219       -       
 concentrate    ounces)                                                         
 Copper cathode (`000      8.9    8.7   8.2    8.4   10.4    10.4     8.9       
 (SXEW)         tonnes)                                                         
Payable silver (`000        -  100.0 240.1  226.4   64.0    64.0       -       
 concentrate    ounces)                                                         
 (a)Sulphide production at Tintaya was temporarily suspended in January         
 2002 due to weak market conditions.                                            
Sulphide mining operations recommenced during August 2003.                    
Cerro                                                                           
Colorado,                                                                       
Chile                                                                           
Material     (`000      20,332 19,855 16,199 16,697 17,554  17,554  20,332     
 mined        tonnes)                                                           
 Ore milled   (`000      4,346  4,405 3,700  4,330  4,232   4,232   4,346       
             tonnes)                                                            
Average      (%)        0.99%  1.00% 0.92%  0.90%  0.87%   0.87%   0.99%       
 copper grade                                                                   
 Production                                                                     
 Copper       (`000       33.1   33.0  28.1   31.3   28.3    28.3    33.1       
cathode      tonnes)                                                           
 Sales                                                                          
 Copper       (`000       28.9   35.2  27.8   35.5   28.9    28.9    28.9       
 cathode      tonnes)                                                           
Antamina,                                                                       
Peru                                                                            
 Material     (`000      30,174 28,474 28,588 36,035 33,177  33,177  30,174     
 mined (100%) tonnes)                                                           
Ore milled   (`000      6,018  7,273 6,954  8,205  8,069   8,069   6,018       
 (100%)       tonnes)                                                           
 Average head                                                                   
 grades                                                                         
- Copper    (%)        1.17%  1.17% 1.26%  1.37%  1.26%   1.26%   1.17%       
  - Zinc      (%)        2.17%  1.77% 1.48%  0.97%  1.02%   1.02%   2.17%       
 Production                                                                     
 Payable      (`000       16.9   20.5  24.6   29.9   29.9    29.9    16.9       
copper       tonnes)                                                           
 Payable zinc (tonnes)   27,933 27,026 19,099 15,545 12,883  12,883  27,933     
 Payable      (`000        435    494   588    662    692     692     435       
 silver       ounces)                                                           
Payable      (`000       0.03   0.02  0.08   0.24   0.32    0.32    0.03       
 molybdenum   tonnes)                                                           
 Sales                                                                          
 Payable      (`000       18.6   22.6  20.2   26.4   32.1    32.1    18.6       
copper       tonnes)                                                           
 Payable zinc (tonnes)   26,781 26,928 14,219 19,931 13,617  13,617  26,781     
 Payable      (`000        420    491   423    655    624     624     420       
 silver       ounces)                                                           
Payable      (`000       0.01   0.03  0.04   0.11   0.16    0.16    0.01       
 molybdenum   tonnes)                                                           
Cannington,                                                                     
Australia                                                                       
Material     (`000        637    699   729    681    828     828     637       
 mined        tonnes)                                                           
 Ore milled   (`000        589    598   698    724    730     730     589       
             tonnes)                                                            
Average head                                                                   
 grades                                                                         
  - Silver    (g/t)        564    497   539    486    504     504     564       
  - Lead      (%)        11.5%  10.5% 11.4%  10.8%  10.3%   10.3%   11.5%       
- Zinc      (%)         4.0%   3.4%  3.5%   3.4%   3.1%    3.1%    4.0%       
 Production                                                                     
 Payable      (`000      9,177  8,287 10,485  9,471 10,339  10,339   9,177      
 silver       ounces)                                                           
Payable lead (tonnes)   59,364 55,211 70,838 64,472 64,910  64,910  59,364     
 Payable zinc (tonnes)   14,850 11,692 13,589 13,493 10,968  10,968  14,850     
 Sales                                                                          
 Payable      (`000      6,765 10,716 8,569 12,583  9,266   9,266   6,765       
silver       ounces)                                                           
 Payable lead (tonnes)   43,953 69,447 56,259 84,315 62,774  62,774  43,953     
 Payable zinc (tonnes)   16,223 15,443 12,790 13,410 12,170  12,170  16,223     
Pinto Valley,                                                                   
USA                                                                             
 Production                                                                     
 Copper       (`000        2.5    2.4   2.4    2.2    2.3     2.3     2.5       
 cathode      tonnes)                                                           
(SXEW)                                                                         
 Sales                                                                          
 Copper       (`000        2.5    2.4   2.3    2.3    1.5     1.5     2.5       
 cathode      tonnes)                                                           
(SXEW)                                                                         
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                                  QUARTER ENDED              QUARTER            
ENDED              
                          SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
CARBON STEEL                                                                    
MATERIALS                                                                       
BHP Billiton attributable production                                            
and sales unless otherwise stated.                                              
(`000 tonnes)                                                                   
IRON ORE (a)                                                                    
Pilbara,                                                                        
Australia                                                                       
 Production                                                                     
Mt Newman               6,639  6,707 6,031  5,084 6,157   6,157  6,639         
 Joint Venture                                                                  
 Goldsworthy             1,633  1,477 1,348  1,386 1,038   1,038  1,633         
 Joint Venture                                                                  
Area C Joint              341  1,048 1,768  2,519 2,990   2,990    341         
 Venture (b)                                                                    
 Yandi Joint             8,679  9,005 8,429  8,046 8,767   8,767  8,679         
 Venture                                                                        
Jimblebar               1,622  1,520 1,647  1,566 1,675   1,675  1,622         
 Total (BHP              18,914 19,757 19,223 18,601 20,627  20,627 18,914      
 Billiton                                                                       
 share)                                                                         
Total                   21,965 22,975 22,326 21,608 23,517  23,517 21,965      
 production                                                                     
 (100%)                                                                         
 Shipments                                                                      
Lump                    4,898  5,169 5,402  5,064 5,532   5,532  4,898         
 Fines                   13,334 13,968 13,181 14,067 14,457  14,457 13,334      
 Total (BHP              18,232 19,137 18,583 19,131 19,989  19,989 18,232      
 Billiton                                                                       
share)                                                                         
 Total                   21,450 22,515 21,862 22,507 23,971  23,971 21,450      
 shipments                                                                      
 (100%)                                                                         
(a) Iron ore production and shipments are                                      
 reported on a wet tonnes basis.                                                
 (b) Production commenced in May 2003.                                          
Samarco, Brazil                                                                 
Production              1,956  1,971 1,862  1,936 1,918   1,918  1,956         
 Shipments               2,013  1,886 1,918  1,994 1,976   1,976  2,013         
METALLURGICAL                                                                   
COAL (a)                                                                        
Queensland,                                                                     
Australia                                                                       
 Production                                                                     
 BMA                                                                            
Blackwater              1,578  1,581 1,508  1,864 1,638   1,638  1,578         
 Goonyella                 994    829 1,019    935 1,112   1,112    994         
 Peak Downs              1,004  1,004   881  1,223 1,198   1,198  1,004         
 Saraji                    747    655   703    806   809     809    747         
Norwich Park              524    582   556    682   700     700    524         
 Gregory Joint             744    744   596    775   774     774    744         
 Venture                                                                        
 BMA total               5,591  5,395 5,263  6,285 6,231   6,231  5,591         
BHP Mitsui                                                                     
 Coal (b)                                                                       
 Riverside                 969    812   967    575   910     910    969         
 South Walker              957    779   844  1,078   838     838    957         
Creek                                                                          
 BHP Mitsui              1,926  1,591 1,811  1,653 1,748   1,748  1,926         
 Coal total                                                                     
 Queensland              7,517  6,986 7,074  7,938 7,979   7,979  7,517         
total                                                                          
 Shipments                                                                      
 Coking coal             4,838  5,258 5,116  4,777 5,188   5,188  4,838         
 Weak coking             1,617  1,649 1,585  1,569 1,665   1,665  1,617         
coal                                                                           
 Thermal coal              801    987   803    756   743     743    801         
 Total                   7,256  7,894 7,504  7,102 7,596   7,596  7,256         
 (a) Coal production is reported on the basis of saleable                       
product.Production figures include some thermal coal.                          
 (b) BHP Mitsui Coal production shown on 100% basis before 20% outside          
 equity interest.                                                               
Illawarra,                                                                      
Australia                                                                       
 Production              1,582  1,459 1,458  1,346 1,298   1,298  1,582         
 Shipments                                                                      
 Coking coal             1,513  1,293 1,359  1,215 1,097   1,097  1,513         
Thermal coal               91     47   134    114    82      82     91         
 Total                   1,604  1,340 1,493  1,329 1,179   1,179  1,604         
MANGANESE ORES                                                                  
South Africa                                                                    
Saleable                  600    651   604    647   632     632    600         
 production (a)                                                                 
 (a) Shown on 100% basis, BHP Billiton interest in saleable production          
 is 60%.                                                                        
Australia                                                                       
 Saleable                  553    548   660    690   747     747    553         
 production (a)                                                                 
 (a) Shown on 100% basis, BHP Billiton interest in saleable production          
is 60%.                                                                        
MANGANESE                                                                       
ALLOYS                                                                          
South Africa                                                                    
Saleable                   93    122   116    131   121     121     93         
 production (a)                                                                 
 (a) Shown on 100% basis, BHP Billiton interest in saleable production          
 is 60%.                                                                        
Australia                                                                       
 Saleable                   54     61    63     72    74      74     54         
 production (a)                                                                 
 (a) Shown on 100% basis, BHP Billiton interest in saleable production          
is 60%.                                                                        
HOT BRIQUETTED                                                                  
IRON                                                                            
Boodarie(TM)                                                                    
Iron, Australia                                                                 
 Production (a)            496    527   399    294     -       -    496         
 Shipments                 435    570   436    318     -       -    435         
 (a) Production was suspended at Boodarie Iron following a gas                  
explosion in May 2004.                                                         
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                                  QUARTER ENDED              QUARTER            
ENDED              
                          SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
BHP Billiton attributable production                                            
and sales unless otherwise stated.                                              
DIAMONDS                                                                        
Ekati(TM),                                                                      
Canada                                                                          
 Ore Processed  (`000    1,064  1,123 1,052  1,207 1,184   1,184  1,064         
 (100%)         tonnes)                                                         
Production     (`000    1,552  1,704 1,015  1,211   986     986  1,552         
               carats)                                                          
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED              QUARTER            
                                                             ENDED              
                          SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
ENERGY COAL                                                                     
BHP Billiton attributable production                                            
and sales unless otherwise stated.                                              
(`000 tonnes)                                                                   
Ingwe, South                                                                    
Africa                                                                          
 Production              13,782 13,472 13,231 13,768 14,588  14,588 13,782      
 Sales                                                                          
Export                  5,274  5,500 5,354  4,830 5,551   5,551  5,274         
 Local utility           8,215  7,701 7,579  8,426 8,546   8,546  8,215         
 Inland                    338    326   330    361   383     383    338         
 Total                   13,827 13,527 13,263 13,617 14,480  14,480 13,827      
New Mexico, USA                                                                 
 Production                                                                     
 Navajo Coal             2,240  1,553 1,709  1,714 2,083   2,083  2,240         
 San Juan Coal           1,320  1,276 1,978  1,440 1,816   1,816  1,320         
Total                   3,560  2,829 3,687  3,154 3,899   3,899  3,560         
 Sales - local           3,713  3,327 3,213  3,353 3,897   3,897  3,713         
 utility                                                                        
Hunter Valley,                                                                  
Australia                                                                       
 Production              1,756  2,054 2,318  2,590 2,595   2,595  1,756         
 Sales                                                                          
 Export                    952    861 1,729  1,734 1,440   1,440    952         
Inland                    873    633 1,044    958 1,220   1,220    873         
 Total                   1,825  1,494 2,773  2,692 2,660   2,660  1,825         
Cerrejon Coal,                                                                  
Colombia                                                                        
Production              2,036  1,623 2,043  1,982 2,163   2,163  2,036         
 Sales - export          1,966  1,999 1,828  2,283 2,166   2,166  1,966         
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED              QUARTER            
                                                             ENDED              
                          SEPT    DEC MARCH   JUNE  SEPT    SEPT   SEPT         
                          2003   2003  2004   2004  2004    2004   2003         
STAINLESS STEEL                                                                 
MATERIALS                                                                       
BHP Billiton attributable production                                            
and sales unless otherwise stated.                                              
(`000 tonnes)                                                                   
NICKEL                                                                          
CMSA, Colombia                                                                  
 Production               12.4   12.2  12.5   12.0  11.9    11.9   12.4         
Sales                    11.1   13.1  11.2   12.8  10.6    10.6   11.1         
Yabulu,                                                                         
Australia                                                                       
 Production                                                                     
Nickel                    8.2    7.8   8.7    7.9   7.7     7.7    8.2         
 Cobalt                    0.4    0.5   0.5    0.5   0.5     0.5    0.4         
 Sales                                                                          
 Nickel                    7.8    8.4   8.0    7.9   7.7     7.7    7.8         
Cobalt                    0.4    0.5   0.5    0.4   0.4     0.4    0.4         
FERROCHROME