BIL - BHP Billiton Plc - BHP Billiton production r19 Oct 2011
BIL
BIBLT                                                                           
BIL - BHP Billiton Plc - BHP Billiton production report for the quarter ended   
30 September 2011                                                               
BHP Billiton Plc                                                                
Share code:    BIL                                                              
ISIN:          GB0000566504                                                     
NEWS RELEASE                                                                    
19 October 2011                                                                 
29/11                                                                           
BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2011          
* Western Australia Iron Ore shipments rose to a record annualised rate of 173  
million tonnes per annum in the September 2011 quarter (100% basis), a 28%      
increase over the previous corresponding period.                                
* Petroleum production increased 19% in the period, reflecting the successful   
acquisition of the Fayetteville and Petrohawk Onshore US shale businesses on    
top of strong operating performance from existing assets.                       
* Quarterly production records were also achieved at New South Wales Energy     
Coal and Illawarra Coal (both Australia), Cerrejon Coal (Colombia) and the      
Alumar refinery (Brazil). Record material mined and milling rates at Antamina   
(Peru) coincided with a significant improvement in copper grades.               
Petroleum                                                                       
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Crude oil, condensate and natural gas        21,838      -14%        3%         
liquids (`000 bbl)                                                              
Natural gas (bcf)                            177.35      68%         35%        
Total petroleum products (million boe)       51.40       19%         19%        
Total petroleum production - Petroleum production increased 19 per cent in the  
period, reflecting the successful acquisition of the Fayetteville and           
Petrohawk Onshore US shale businesses on top of strong operating performance    
from existing assets.                                                           
Crude oil, condensate and natural gas liquids - Liquids production increased    
on the June 2011 quarter following strong operated field performance,           
development drilling at Shenzi (USA) and new volumes from the Onshore US        
assets. This was partly offset by shutdowns associated with non operated        
maintenance and drilling deferrals in the deepwater Gulf of Mexico (USA).       
Importantly, Mad Dog (USA) production is expected to recommence by the end of   
the 2011 calendar year following a period of maintenance related downtime.      
Natural gas - Natural gas production was higher than all comparable periods     
and reflected approximately 40 days of production from the recently acquired    
Petrohawk shale assets and a full quarter of production from the Angostura Gas  
Phase II project (Trinidad and Tobago).                                         
Aluminium                                                                       
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
QTR         SEP Q10     JUN Q11      
Alumina (`000 tonnes)                        1,060       6%          3%         
Aluminium (`000 tonnes)                      315         0%          1%         
Alumina - Consistent performance from the expanded refinery capacity            
facilitated record quarterly production at Alumar and a modest increase in      
total alumina production in the period.                                         
Aluminium - Production was in line with comparable periods with all operations  
running at, or close to, effective capacity.                                    
Base Metals                                                                     
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Copper (`000 tonnes)                         220.3       -24%        -19%       
Lead (tonnes)                                55,659      -19%        -5%        
Zinc (tonnes)                                23,444      -42%        -33%       
Silver (`000 ounces)                         9,151       -25%        -7%        
Uranium oxide concentrate (Uranium) (tonnes) 1,000       -1%         -1%        
Copper - Lower ore grades and industrial action at Escondida (Chile), planned   
maintenance activity at Pampa Norte (Chile) and planned smelter and refinery    
outages at Olympic Dam (Australia) all impacted copper production in the        
period. Record material mined and milling rates were, however, achieved at      
Antamina and coincided with operations progressing through a copper rich ore    
zone.                                                                           
Due to industrial action,that impacted operations in the September 2011         
quarter, Escondida production is now expected to be marginally lower in the     
2012 financial year with volumes weighted to the second half. Production is     
expected to improve beyond the 2012 financial year as mining activities         
progress towards higher grade ore with completion of the Escondida Ore Access   
project in the main pit.                                                        
Lead/zinc/silver - A broad decline in average ore grades across the Antamina    
and Cannington (Australia) operations resulted in lower production relative to  
all comparable periods.                                                         
Uranium - The steady grade profile of the Olympic Dam ore body was further      
illustrated by the consistent production performance of the uranium circuit.    
Diamonds & Specialty Products                                                   
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Diamonds (`000 carats)                       457         -35%        -21%       
Diamonds - Production was lower than all comparable periods due to the ongoing  
decline in average ore grades and unseasonably high rainfall that impacted      
operations. EKATI (Canada) production is expected to be impacted in the medium  
term as operations transition to lower grade material, consistent with the      
mine plan.                                                                      
Stainless Steel Materials                                                       
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
QTR         SEP Q10     JUN Q11      
Nickel (`000 tonnes)                         35.1        -9%         -8%        
Nickel - Contained nickel production at Cerro Matoso (Colombia) increased from  
the prior quarter following the successful early completion of the planned      
furnace replacement during the September 2011 quarter.                          
Metal production from the Nickel West Kwinana refinery (Australia) was          
stronger than the June 2011 quarter as the availability of third party          
hydrogen supply improved in the period. This was, however, offset by lower      
matte production following a planned outage at the Nickel West Kalgoorlie       
smelter (Australia).                                                            
Higher matte sales are anticipated in the December 2011 quarter as a planned    
outage at a third party hydrogen supplier will see production shift back        
towards the Nickel West Kalgoorlie smelter. BHP Billiton expects the            
construction of its wholly owned hydrogen plant to be completed before the end  
of the March 2012 quarter.                                                      
Iron Ore                                                                        
SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Iron ore (`000 tonnes)                       39,572      24%         11%        
Iron ore - Western Australia Iron Ore (WAIO) shipments rose to a record         
annualised rate of 173 million tonnes per annum in the quarter (100% basis).    
WAIO continued to benefit from the dual tracking of the company`s rail          
infrastructure, increasing overall system capability. The Yandi Joint Venture   
(Australia) achieved a significant increase in mine production following the    
ramp up of Ore Handling Plant 3 under the management of BHP Billiton`s owner    
operator workforce.                                                             
Consistently strong performance following the ramp up of the third pellet       
plant at Samarco (Brazil) continues to reinforce our confidence in the next     
phase of expansion.                                                             
Manganese                                                                       
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Manganese ore (`000 tonnes)                  2,019       -5%         13%        
Manganese alloy (`000 tonnes)                194         -3%         2%         
Manganese ore - Production and sales were stronger than the June 2011 quarter   
as plant availability at GEMCO (Australia) improved and Hotazel (South Africa)  
benefited from record quarterly production from the Mamatwan mine.              
Manganese alloy - Alloy production was in line with comparable periods.         
Metallurgical Coal                                                              
                                            SEP 2011 QTR SEP Q11 vs  SEP Q11 vs 
SEP Q10     JUN Q11      
Metallurgical coal (`000 tonnes)             9,291        -10%        17%       
Metallurgical coal - Queensland Coal (Australia) volumes increased in the       
quarter as production continued to ramp up to pre-flood levels, despite         
stoppages associated with ongoing labour negotiations. Consistent with prior    
guidance, we expect to be impacted by the remnant effects of the wet weather,   
to some extent, for the remainder of the 2011 calendar year. At this stage it   
is not possible to determine when the labour negotiations will conclude.        
Illawarra Coal achieved record quarterly production following longwall moves    
at Dendrobium and Appin in the June 2011 quarter. Lower volumes are forecast    
for the December 2011 quarter with a planned shutdown at the West Cliff Coal    
Handling Preparation Plant to enable upgrade works to be completed.             
Energy Coal                                                                     
                                            SEP 2011    SEP Q11 vs  SEP Q11 vs  
                                           QTR         SEP Q10     JUN Q11      
Energy coal (`000 tonnes)                    18,460      8%          1%         
Energy coal - A significant improvement in performance was delivered across     
our high value, export oriented operations as quarterly production records      
were achieved at New South Wales Energy Coal and Cerrejon Coal. South Africa    
Coal recorded an equally impressive 11 per cent increase in total production    
from the prior quarter.                                                         
Lower production at New Mexico Coal (USA) was indicative of an increase in the  
strip ratio at Navajo Coal and an underground fire at San Juan Coal in          
September 2011. The San Juan Coal mine remains closed pending an investigation  
into the cause of the fire. Generator demand is currently being met by          
available stockpiles.                                                           
Throughout this report, unless otherwise stated, production volumes refer to    
BHP Billiton`s share and exclude suspended and sold operations.                 
This report, together with the Exploration and Development Report, represents   
the Interim Management Statement for the purposes of the UK Listing             
Authority`s Disclosure and Transparency Rules. There have been no significant   
changes to the financial position of the Group in the quarter ended 30          
September 2011, other than those arising from the Group`s previously announced  
acquisition of Petrohawk Energy Corporation that was completed during the       
period which affected the Group`s cash reserves, net debt and gearing levels.   
****                                                                            
Further information on BHP Billiton can be found at: www.bhpbilliton.com        
Sponsor: Absa Capital (the investment banking division of Absa Bank Limited,    
affiliated with Barclays Capital)                                               
Media Relations                                                                 
Australia                                                                       
Samantha Stevens                                                                
Tel: +61 3 9609 2898  Mobile: +61 400 693 915                                   
email: Samantha.Stevens@bhpbilliton.com                                         
Kelly Quirke                                                                    
Tel: +61 3 9609 2896  Mobile: +61 429 966 312                                   
email: Kelly.Quirke@bhpbilliton.com                                             
Fiona Martin                                                                    
Tel: +61 3 9609 2211  Mobile: +61 427 777 908                                   
email: Fiona.Martin2@bhpbilliton.com                                            
United Kingdom and Americas                                                     
Ruban Yogarajah                                                                 
Tel: US +1 713 966 2907 or UK +44 20 7802 4033                                  
Mobile: UK +44 7827 082 022                                                     
email: Ruban.Yogarajah@bhpbilliton.com                                          
Investor Relations                                                              
Australia                                                                       
James Agar                                                                      
Tel: +61 3 9609 2222 Mobile: +61 467 807 064                                    
email: James.Agar@bhpbilliton.com                                               
Andrew Gunn                                                                     
Tel: +61 3 9609 3575  Mobile: +61 439 558 454                                   
email: Andrew.Gunn@bhpbilliton.com                                              
United Kingdom and South Africa                                                 
Brendan Harris                                                                  
Tel: +44 20 7802 4131  Mobile: +61 437 134 814                                  
email: Brendan.Harris@bhpbilliton.com                                           
Americas                                                                        
Scott Espenshade                                                                
Tel: +1 713 599 6431  Mobile: +1 713 208 8565                                   
email: Scott.Espenshade@bhpbilliton.com                                         
BHP Billiton Limited ABN 49 004 028 077                                         
Registered in Australia                                                         
Registered Office: 180 Lonsdale Street                                          
Melbourne Victoria 3000 Australia                                               
Tel +61 1300 55 4757 Fax +61 3 9609 3015                                        
BHP Billiton Plc Registration number 3196209                                    
Registered in England and Wales                                                 
Registered Office: Neathouse Place                                              
London SW1V 1BH United Kingdom                                                  
Tel +44 20 7802 4000 Fax +44 20 7802 4111                                       
Members of the BHP Billiton Group which is headquartered in Australia           
BHP BILLITON PRODUCTION SUMMARY - CONTINUING                                    
OPERATIONS                                                                      
QUARTER ENDED                 YEAR TO DATE                
                                                                   SEP    SEP   
                                                                   Q11    Q11   
                      SEP       JUN       SEP       SEP    SEP     vs     vs    
2010      2011      2011      2011   2010    SEP    JUN   
                                                                   Q10    Q11   
PETROLEUM                                                                       
Crude oil &   (`000                                                -16%  -1%    
condensate    bbl)       22,087   18,652   18,482   18,482  22,087              
Natural gas   (bcf)                                                68%   35%    
                        105.83   131.79   177.35   177.35  105.83               
Natural gas   (`000                                                0%    27%    
liquid        bbl)       3,363    2,636    3,356    3,356   3,363               
Total         (million                                             19%   19%    
Petroleum     boe)       43.09    43.25    51.40    51.40   43.09               
Products                                                                        
ALUMINIUM                                                                       
Alumina       (`000                                                6%    3%     
             tonnes)    1,000    1,026    1,060    1,060   1,000                
Aluminium     (`000                                                0%    1%     
tonnes)    314      313      315      315     314                  
BASE METALS                                                                     
Copper        (`000                                                -24%  -19%   
             tonnes)    291.2    272.3    220.3    220.3   291.2                
Lead          (tonnes)                                             -19%  -5%    
                        69,141   58,578   55,659   55,659  69,141               
Zinc          (tonnes)                                             -42%  -33%   
                        40,197   34,733   23,444   23,444  40,197               
Gold          (ounces)                                             -20%  -13%   
                        49,361   45,545   39,439   39,439  49,361               
Silver        (`000                                                -25%  -7%    
             ounces)    12,152   9,877    9,151    9,151   12,152               
Uranium oxide (tonnes)                                             -1%   -1%    
concentrate              1,010    1,015    1,000    1,000   1,010               
Molybdenum    (tonnes)                                             186%  42%    
                        208      418      595      595     208                  
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
Diamonds      (`000                                                -35%  -21%   
             carats)    703      576      457      457     703                  
STAINLESS                                                                       
STEEL                                                                           
MATERIALS                                                                       
Nickel        (`000                                                -9%   -8%    
tonnes)    38.5     38.2     35.1     35.1    38.5                 
IRON ORE                                                                        
Iron ore      (`000                                                24%   11%    
             tonnes)    31,983   35,526   39,572   39,572  31,983               
MANGANESE                                                                       
Manganese ore (`000                                                -5%   13%    
             tonnes)    2,122    1,790    2,019    2,019   2,122                
Manganese     (`000                                                -3%   2%     
alloy         tonnes)    199      190      194      194     199                 
METALLURGICAL                                                                   
COAL                                                                            
Metallurgical (`000                                                -10%  17%    
coal          tonnes)    10,299   7,922    9,291    9,291   10,299              
ENERGY COAL                                                                     
Energy coal   (`000                                                8%    1%     
             tonnes)    17,106   18,338   18,460   18,460  17,106               
Throughout this report figures in italics indicate that this figure has been    
adjusted since it was previously reported.                                      
BHP BILLITON                                                                    
ATTRIBUTABLE PRODUCTION                                                         
QUARTER ENDED                         YEAR TO DATE     
               BHP       SEP     DEC    MAR     JUN     SEP    SEP     SEP      
               Billiton                                                         
               Interest  2010    2010   2011    2011    2011   2011    2010     
PETROLEUM                                                                       
Production                                                                      
Crude oil &                                                                     
condensate               22,087  20,652 19,200  18,652  18,482 18,482  22,087   
(`000 bbl)                                                                      
Natural gas                                                                     
(bcf)                    105.83  82.54  84.90   131.79  177.35 177.35  105.83   
NGL (`000                                                                       
bbl) (a)                 3,363   2,842  2,442   2,636   3,356  3,356   3,363    
Total Petroleum                                                                 
Products (million boe)   43.09   37.25  35.79   43.25   51.40  51.40   43.09    
ALUMINIUM                                                                       
ALUMINA                                                                         
Production (`000                                                                
tonnes)                                                                         
Worsley         86%                                                             
756     758    663     725     752    752     756      
Alumar          36%                                                             
                         244     267    296     301     308    308     244      
Total                                                                           
1,000   1,025  959     1,026   1,060  1,060   1,000    
ALUMINIUM                                                                       
Production (`000                                                                
tonnes)                                                                         
Hillside        100%                                                            
                         180     179    173     179     180    180     180      
Bayside         100%                                                            
                         24      25     24      24      25     25      24       
Alumar          40%                                                             
                         44      43     44      43      44     44      44       
Mozal           47%                                                             
                         66      67     64      67      66     66      66       
Total                                                                           
                         314     314    305     313     315    315     314      
BASE METALS (b)                                                                 
COPPER                                                                          
Payable metal in                                                                
concentrate (`000                                                               
tonnes)                                                                         
Escondida      57.5%                                                            
110.7   112.7  87.7    79.4    49.9   49.9    110.7    
Antamina       33.8%                                                            
                         23.2    27.2   24.9    22.5    30.3   30.3    23.2     
Total                                                                           
133.9   139.9  112.6   101.9   80.2   80.2    133.9    
Cathode (`000                                                                   
tonnes)                                                                         
Escondida      57.5%                                                            
45.0    47.1   44.4    42.6    32.9   32.9    45.0     
Pampa Norte    100%                                                             
(c)                      66.4    66.0   64.1    75.7    65.4   65.4    66.4     
Pinto Valley   100%                                                             
1.4     1.5    1.4     1.4     1.4    1.4     1.4      
Olympic Dam    100%                                                             
                         44.5    47.8   51.1    50.7    40.4   40.4    44.5     
Total                                                                           
157.3   162.4  161.0   170.4   140.1  140.1   157.3    
LEAD                                                                            
Payable metal                                                                   
in concentrate                                                                  
(tonnes)                                                                        
Cannington     100%                                                             
                         68,529  64,748 51,673  58,414  55,557 55,557  68,529   
Antamina       33.8%                                                            
612     177    237     164     102    102     612      
Total                                                                           
                         69,141  64,925 51,910  58,578  55,659 55,659  69,141   
ZINC                                                                            
Payable metal                                                                   
in concentrate                                                                  
(tonnes)                                                                        
Cannington     100%                                                             
15,260  14,920 16,129  14,348  14,488 14,488  15,260   
Antamina       33.8%                                                            
                         24,937  22,025 24,123  20,385  8,956  8,956   24,937   
Total                                                                           
40,197  36,945 40,252  34,733  23,444 23,444  40,197   
Refer                                                                           
footnotes on                                                                    
page 4                                                                          
BASE METALS                                                                     
(continued)                                                                     
GOLD                                                                            
Payable metal                                                                   
in concentrate                                                                  
(ounces)                                                                        
Escondida      57.5%                                                            
                         24,807  23,133 19,667  17,116  11,063 11,063  24,807   
Olympic Dam    100%                                                             
(refined                 24,554  28,493 29,892  28,429  28,376 28,376  24,554   
gold)                                                                           
Total                                                                           
49,361  51,626 49,559  45,545  39,439 39,439  49,361   
SILVER                                                                          
Payable metal in                                                                
concentrate (`000                                                               
ounces)                                                                         
Escondida      57.5%                                                            
                         803     796    670     580     403    403     803      
Antamina       33.8%                                                            
989     1,025  813     773     972    972     989      
Cannington     100%                                                             
                         10,159  9,509  7,315   8,242   7,559  7,559   10,159   
Olympic Dam    100%                                                             
(refined                 201     241    258     282     217    217     201      
silver)                                                                         
Total                                                                           
                         12,152  11,571 9,056   9,877   9,151  9,151   12,152   
URANIUM OXIDE                                                                   
CONCENTRATE                                                                     
Payable metal                                                                   
in concentrate                                                                  
(tonnes)                                                                        
Olympic Dam    100%                                                             
                         1,010   957    1,063   1,015   1,000  1,000   1,010    
Total                                                                           
1,010   957    1,063   1,015   1,000  1,000   1,010    
MOLYBDENUM                                                                      
Payable metal                                                                   
in concentrate                                                                  
(tonnes)                                                                        
Antamina       33.8%                                                            
                         208     485    334     418     595    595     208      
Total                                                                           
208     485    334     418     595    595     208      
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
DIAMONDS                                                                        
Production (`000                                                                
carats)                                                                         
EKATI (TM)      80%                                                             
                         703     676    551     576     457    457     703      
STAINLESS STEEL                                                                 
MATERIALS                                                                       
NICKEL                                                                          
Production (`000                                                                
tonnes)                                                                         
CMSA            99.9%                                                           
                         12.4    12.4   7.8     7.4     10.4   10.4    12.4     
Nickel West     100%                                                            
26.1    30.6   25.2    30.8    24.7   24.7    26.1     
Total                                                                           
                         38.5    43.0   33.0    38.2    35.1   35.1    38.5     
Refer                                                                           
footnotes on                                                                    
page 4                                                                          
IRON ORE                                                                        
Production (`000                                                                
tonnes) (d)                                                                     
Newman (e)      85%                                                             
                         9,640   11,213 11,912  12,480  13,158 13,158  9,640    
Goldsworthy     85%                                                             
Joint Venture            384     225    305     284     254    254     384      
Area C Joint    85%                                                             
Venture                  10,086  10,154 9,510   10,044  10,479 10,479  10,086   
Yandi Joint     85%                                                             
Venture                  8,787   9,078  8,799   9,796   12,708 12,708  8,787    
Samarco         50%                                                             
                         3,086   2,996  2,705   2,922   2,973  2,973   3,086    
Total                                                                           
31,983  33,666 33,231  35,526  39,572 39,572  31,983   
MANGANESE                                                                       
MANGANESE ORES                                                                  
Saleable                                                                        
production (`000                                                                
tonnes)                                                                         
South Africa    60%                                                             
(f)                      938     779    514     776     911    911     938      
Australia (f)   60%                                                             
                         1,184   1,050  838     1,014   1,108  1,108   1,184    
Total                                                                           
                         2,122   1,829  1,352   1,790   2,019  2,019   2,122    
MANGANESE ALLOYS                                                                
Saleable                                                                        
production (`000                                                                
tonnes)                                                                         
South Africa    60%                                                             
(f) (g)                  132     123    111     120     124    124     132      
Australia (f)   60%                                                             
                         67      69     61      70      70     70      67       
Total                                                                           
                         199     192    172     190     194    194     199      
METALLURGICAL                                                                   
COAL                                                                            
Production (`000                                                                
tonnes) (h)                                                                     
BMA             50%                                                             
                         6,538   4,534  3,955   4,874   5,274  5,274   6,538    
BHP Mitsui      80%                                                             
Coal (i)                 1,913   1,421  1,133   1,426   1,803  1,803   1,913    
Illawarra       100%                                                            
                         1,848   1,832  1,582   1,622   2,214  2,214   1,848    
Total                                                                           
                         10,299  7,787  6,670   7,922   9,291  9,291   10,299   
ENERGY COAL                                                                     
Production (`000                                                                
tonnes)                                                                         
South Africa    100%                                                            
                         8,997   8,507  8,596   8,228   9,095  9,095   8,997    
USA             100%                                                            
3,177   2,296  2,360   3,779   2,467  2,467   3,177    
Australia       100%                                                            
                         2,506   3,394  3,978   3,793   4,046  4,046   2,506    
Colombia        33%                                                             
2,426   2,316  2,609   2,538   2,852  2,852   2,426    
Total                                                                           
                         17,106  16,513 17,543  18,338  18,460 18,460  17,106   
(a) LPG and Ethane are reported as Natural Gas Liquid (NGL). Product-specific   
conversions are made and NGL is reported in barrels of oil equivalent (boe).    
(b) Metal production is reported on the basis of payable metal.                 
(c) Includes Cerro Colorado and Spence.                                         
(d) Iron ore production is reported on a wet tonnes basis.                      
(e) Newman includes Mt Newman Joint Venture and Jimblebar.                      
(f) Shown on 100% basis.  BHP Billiton interest in saleable production is 60%.  
(g) Production includes Medium Carbon Ferro Manganese.                          
(h) Metallurgical coal production is reported on the basis of saleable          
product. Production figures include some thermal coal.                          
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.   
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED                         YEAR TO DATE     
                         SEP     DEC    MAR     JUN     SEP    SEP     SEP      
                         2010    2010   2011    2011    2011   2011    2010     
PETROLEUM                                                                       
BHP Billiton attributable production unless otherwise stated.                   
CRUDE OIL & CONDENSATE                                                          
(`000 barrels)                                                                  
Bass Strait                                                                     
2,711   2,553  2,465   2,485   2,527  2,527   2,711    
North West Shelf                                                                
                         2,237   2,188  1,719   1,442   1,400  1,400   2,237    
Stybarrow                                                                       
551     358    862     1,037   1,171  1,171   551      
Pyrenees                                                                        
                         5,516   5,362  4,326   4,584   3,901  3,901   5,516    
Other Australia                                                                 
(a)                      15      10     13      13      13     13      15       
Atlantis (b)                                                                    
                         3,038   2,881  2,694   2,098   2,081  2,081   3,038    
Mad Dog (b)                                                                     
1,075   874    952     128     -      -       1,075    
Shenzi (b) (c)                                                                  
                         3,916   3,859  3,378   3,630   3,848  3,848   3,916    
Onshore US (d)                                                                  
-       -      -       -       672    672     -        
Trinidad/Tobago                                                                 
                         285     -      299     687     466    466     285      
Other Americas                                                                  
(b) (e)                  359     430    397     448     373    373     359      
UK                                                                              
                         611     479    542     534     447    447     611      
Algeria                                                                         
1,686   1,587  1,474   1,498   1,498  1,498   1,686    
Pakistan                                                                        
                         87      71     79      68      85     85      87       
Total                                                                           
22,087  20,652 19,200  18,652  18,482 18,482  22,087   
NATURAL GAS                                                                     
(billion cubic                                                                  
feet)                                                                           
Bass Strait                                                                     
                         38.81   20.94  22.31   29.97   31.88  31.88   38.81    
North West Shelf                                                                
                         36.49   36.47  35.11   35.44   32.97  32.97   36.49    
Other Australia                                                                 
(a)                      6.00    3.83   4.69    4.68    4.45   4.45    6.00     
Atlantis (b)                                                                    
                         1.33    1.07   0.84    0.67    0.64   0.64    1.33     
Mad Dog (b)                                                                     
                         0.25    0.06   0.13    0.01    -      -       0.25     
Shenzi (b) (c)                                                                  
                         0.75    0.77   0.64    0.67    0.62   0.62    0.75     
Onshore US (d)                                                                  
                         -       -      -       36.43   77.59  77.59   -        
Trinidad/Tobago                                                                 
                         -       -      -       4.69    9.31   9.31    -        
Other Americas                                                                  
(b) (e)                  1.40    1.32   1.33    1.42    1.19   1.19    1.40     
UK                                                                              
                         6.31    6.14   6.32    5.69    3.91   3.91    6.31     
Pakistan                                                                        
                         14.49   11.94  13.53   12.12   14.79  14.79   14.49    
Total                                                                           
                         105.83  82.54  84.90   131.79  177.35 177.35  105.83   
NGL (`000 barrels)                                                              
Bass Strait                                                                     
                         2,030   1,412  1,252   1,554   1,823  1,823   2,030    
North West Shelf                                                                
471     442    434     367     423    423     471      
Atlantis (b)                                                                    
                         188     177    150     117     120    120     188      
Mad Dog (b)                                                                     
42      42     39      11      -      -       42       
Shenzi (b) (c)                                                                  
                         196     336    245     252     296    296     196      
Onshore US (d)                                                                  
-       -      -       -       416    416     -        
Other Americas                                                                  
(b) (e)                  42      54     42      47      41     41      42       
UK                                                                              
60      74     79      66      18     18      60       
Algeria                                                                         
                         334     305    201     222     219    219     334      
Total                                                                           
3,363   2,842  2,442   2,636   3,356  3,356   3,363    
TOTAL PETROLEUM                                                                 
PRODUCTS                  43.09   37.25  35.79   43.25   51.40  51.40   43.09   
(million barrels                                                                
of oil equivalent)                                                              
(f)                                                                             
(a) Other Australia includes Minerva.                                           
(b) Gulf of Mexico volumes are net of royalties.                                
(c) The Genghis Khan operation is reported in Shenzi.                           
(d) Fayetteville shale acquisition completed on 31 March 2011. Petrohawk        
Energy Corporation acquisition completed on 20 August 2011.                     
(e) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter.   
(f) Total barrels of oil equivalent (boe) conversions are based on 6000scf of   
natural gas equals 1 boe.                                                       
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED                      YEAR TO DATE   
                              SEP    DEC    MAR    JUN    SEP    SEP    SEP     
                              2010   2010   2011   2011   2011   2011   2010    
ALUMINIUM                                                                       
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
ALUMINA                                                                         
Production                                                                      
Worsley, Australia                                                              
                              756    758    663    725    752    752    756     
Alumar, Brazil                                                                  
                              244    267    296    301    308    308    244     
Total                                                                           
                              1,000  1,025  959    1,026  1,060  1,060  1,000   
Sales                                                                           
Worsley, Australia                                                              
767    735    633    727    720    720    767     
Alumar, Brazil                                                                  
                              239    271    249    324    280    280    239     
Total                                                                           
1,006  1,006  882    1,051  1,000  1,000  1,006   
ALUMINIUM                                                                       
Production                                                                      
Hillside, South                                                                 
Africa                        180    179    173    179    180    180    180     
Bayside, South                                                                  
Africa                        24     25     24     24     25     25     24      
Alumar, Brazil                                                                  
44     43     44     43     44     44     44      
Mozal, Mozambique                                                               
                              66     67     64     67     66     66     66      
Total                                                                           
314    314    305    313    315    315    314     
Sales                                                                           
Hillside, South                                                                 
Africa                        148    160    163    181    163    163    148     
Bayside, South                                                                  
Africa                        29     31     38     29     24     24     29      
Alumar, Brazil                                                                  
                              44     43     43     44     44     44     44      
Mozal, Mozambique                                                               
                              55     76     66     80     60     60     55      
Total                                                                           
                              276    310    310    334    291    291    276     
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                       QUARTER ENDED                           YEAR TO DATE     
                       SEP      DEC    MAR      JUN    SEP     SEP    SEP       
2010     2010   2011     2011   2011    2011   2010      
BASE METALS                                                                     
BHP Billiton attributable production and sales unless otherwise stated.         
Metals production is payable metal unless otherwise stated.                     
Escondida,                                                                      
Chile                                                                           
Material      (`000                                                             
mined (100%)  tonnes)  103,841  98,167 100,966  97,705 69,006  69,006 103,841   
Sulphide ore  (`000                                                             
milled        tonnes)  19,697   18,789 15,993   16,399 12,029  12,029 19,697    
(100%)                                                                          
Average       (%)      1.24%    1.26%  1.15%    1.06%  0.97%   0.97%  1.24%     
copper grade                                                                    
Production    (`000                                                             
ex Mill       tonnes)  197.7    194.6  153.1    141.2  91.9    91.9   197.7     
(100%)                                                                          
Production                                                                      
Payable       (`000                                                             
copper        tonnes)  110.7    112.7  87.7     79.4   49.9    49.9   110.7     
Payable gold  (fine                                                             
concentrate   ounces)  24,807   23,133 19,667   17,116 11,063  11,063 24,807    
Copper        (`000                                                             
cathode (EW)  tonnes)  45.0     47.1   44.4     42.6   32.9    32.9   45.0      
Payable       (`000                                                             
silver        ounces)  803      796    670      580    403     403    803       
concentrate                                                                     
Sales                                                                           
Payable       (`000                                                             
copper        tonnes)  114.8    113.9  74.3     90.9   49.2    49.2   114.8     
Payable gold  (fine                                                             
concentrate   ounces)  25,661   23,357 16,754   20,251 10,974  10,974 25,661    
Copper        (`000                                                             
cathode (EW)  tonnes)  40.0     46.1   47.7     48.0   25.7    25.7   40.0      
Payable       (`000                                                             
silver        ounces)  831      804    569      673    404     404    831       
concentrate                                                                     
Pampa Norte,                                                                    
Chile                                                                           
Cerro                                                                           
Colorado                                                                        
Material      (`000                                                             
mined         tonnes)  15,644   18,290 16,320   17,840 14,736  14,736 15,644    
Ore milled    (`000                                                             
              tonnes)  4,584    4,631  4,251    4,771  4,608   4,608  4,584     
Average       (%)      0.73%    0.76%  0.75%    0.74%  0.72%   0.72%  0.73%     
copper grade                                                                    
Production                                                                      
Copper        (`000                                                             
cathode (EW)  tonnes)  21.7     22.4   22.6     25.7   22.5    22.5   21.7      
Sales                                                                           
Copper        (`000                                                             
cathode (EW)  tonnes)  21.4     24.7   22.5     25.7   22.4    22.4   21.4      
Spence                                                                          
Material      (`000                                                             
mined         tonnes)  17,148   18,389 19,046   19,487 19,816  19,816 17,148    
Ore milled    (`000                                                             
tonnes)  4,427    4,567  4,892    4,545  3,862   3,862  4,427     
Average       (%)      1.25%    1.28%  1.23%    1.22%  1.30%   1.30%  1.25%     
copper grade                                                                    
Production                                                                      
Copper        (`000                                                             
cathode (EW)  tonnes)  44.7     43.6   41.5     50.0   42.9    42.9   44.7      
Sales                                                                           
Copper        (`000                                                             
cathode (EW)  tonnes)  37.0     48.2   45.7     54.5   43.2    43.2   37.0      
Antamina,                                                                       
Peru                                                                            
Material      (`000                                                             
mined (100%)  tonnes)  30,599   32,722 33,154   41,669 44,212  44,212 30,599    
Sulphide ore  (`000                                                             
milled        tonnes)  9,041    9,347  9,288    9,253  9,396   9,396  9,041     
(100%)                                                                          
Average head                                                                    
grades                                                                          
 - Copper     (%)      0.93%    1.06%  0.99%    0.90%  1.11%   1.11%  0.93%     
 - Zinc       (%)      1.35%    1.11%  1.15%    1.03%  0.68%   0.68%  1.35%     
Production                                                                      
Payable       (`000                                                             
copper        tonnes)  23.2     27.2   24.9     22.5   30.3    30.3   23.2      
Payable zinc  (tonnes)                                                          
24,937   22,025 24,123   20,385 8,956   8,956  24,937    
Payable       (`000                                                             
silver        ounces)  989      1,025  813      773    972     972    989       
Payable lead  (tonnes)                                                          
612      177    237      164    102     102    612       
Payable       (tonnes)                                                          
molybdenum             208      485    334      418    595     595    208       
Sales                                                                           
Payable       (`000                                                             
copper        tonnes)  27.7     21.8   26.1     23.5   28.2    28.2   27.7      
Payable zinc  (tonnes)                                                          
                       23,937   24,912 25,571   18,479 9,586   9,586  23,937    
Payable       (`000                                                             
silver        ounces)  1,242    882    839      658    833     833    1,242     
Payable lead  (tonnes)                                                          
                       748      503    180      92     91      91     748       
Payable       (tonnes)                                                          
molybdenum             438      292    394      346    549     549    438       
Cannington,                                                                     
Australia                                                                       
Material      (`000                                                             
mined         tonnes)  742      824    703      841    819     819    742       
Ore milled    (`000                                                             
              tonnes)  831      760    713      786    826     826    831       
Average head                                                                    
grades                                                                          
 - Silver     (g/t)                                                             
                       447      459    377      381    332     332    447       
- Lead       (%)      9.6%     9.9%   8.6%     8.6%   7.9%    7.9%   9.6%      
 - Zinc       (%)      3.0%     3.3%   3.6%     2.9%   2.9%    2.9%   3.0%      
Production                                                                      
Payable       (`000                                                             
silver        ounces)  10,159   9,509  7,315    8,242  7,559   7,559  10,159    
Payable lead  (tonnes)                                                          
                       68,529   64,748 51,673   58,414 55,557  55,557 68,529    
Payable zinc  (tonnes)                                                          
15,260   14,920 16,129   14,348 14,488  14,488 15,260    
Sales                                                                           
Payable       (`000                                                             
silver        ounces)  9,219    9,973  7,263    8,235  6,434   6,434  9,219     
Payable lead  (tonnes)                                                          
                       63,091   67,815 52,199   58,868 48,258  48,258 63,091    
Payable zinc  (tonnes)                                                          
                       12,477   16,621 12,986   14,530 15,734  15,734 12,477    
Olympic Dam,                                                                    
Australia                                                                       
Material      (`000                                                             
mined (a)     tonnes)  2,710    2,513  2,433    2,675  2,543   2,543  2,710     
Ore milled    (`000                                                             
              tonnes)  2,505    2,622  2,670    2,533  2,471   2,471  2,505     
Average       (%)      1.91%    1.78%  1.84%    1.92%  1.98%   1.98%  1.91%     
copper grade                                                                    
Average       kg/t                                                              
uranium                0.54     0.50   0.54     0.54   0.54    0.54   0.54      
grade                                                                           
Production                                                                      
Copper        (`000                                                             
cathode (ER)  tonnes)  41.6     45.0   47.8     47.0   37.6    37.6   41.6      
Copper        (`000                                                             
cathode (EW)  tonnes)  2.9      2.8    3.3      3.7    2.8     2.8    2.9       
Uranium       (tonnes)                                                          
oxide                  1,010    957    1,063    1,015  1,000   1,000  1,010     
concentrate                                                                     
Refined gold  (fine                                                             
ounces)  24,554   28,493 29,892   28,429 28,376  28,376 24,554    
Refined       (`000                                                             
silver        ounces)  201      241    258      282    217     217    201       
Sales                                                                           
Copper        (`000                                                             
cathode (ER)  tonnes)  42.2     45.3   48.7     46.5   36.4    36.4   42.2      
Copper        (`000                                                             
cathode (EW)  tonnes)  2.8      2.9    2.7      4.1    3.5     3.5    2.8       
Uranium       (tonnes)                                                          
oxide                  751      1,121  930      1,143  910     910    751       
concentrate                                                                     
Refined gold  (fine                                                             
ounces)  18,914   29,757 31,742   30,323 28,979  28,979 18,914    
Refined       (`000                                                             
silver        ounces)  201      150    334      269    289     289    201       
(a)     Material mined refers to run of mine ore mined and hoisted.             
Pinto Valley,                                                                   
USA                                                                             
Production                                                                      
Copper        (`000                                                             
cathode (EW)  tonnes)  1.4      1.5    1.4      1.4    1.4     1.4    1.4       
Sales                                                                           
Copper        (`000                                                             
cathode (EW)  tonnes)  1.8      1.0    1.9      1.2    1.7     1.7    1.8       
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                              QUARTER ENDED                      YEAR TO DATE   
                              SEP    DEC    MAR    JUN    SEP    SEP    SEP     
2010   2010   2011   2011   2011   2011   2010    
DIAMONDS AND SPECIALTY                                                          
PRODUCTS                                                                        
BHP Billiton attributable production and sales unless otherwise stated.         
DIAMONDS                                                                        
EKATI (TM) Canada                                                               
Ore Processed        (`000                                                      
(100%)               tonnes)  1,196  1,162  1,122  1,212  1,177  1,177  1,196   
Production           (`000                                                      
                     carats)  703    676    551    576    457    457    703     
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED                      YEAR TO DATE   
                              SEP    DEC    MAR    JUN    SEP    SEP    SEP     
                              2010   2010   2011   2011   2011   2011   2010    
STAINLESS STEEL                                                                 
MATERIALS                                                                       
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
NICKEL                                                                          
CMSA, Colombia                                                                  
Production                                                                      
                              12.4   12.4   7.8    7.4    10.4   10.4   12.4    
Sales                                                                           
12.0   12.8   8.5    8.5    7.7    7.7    12.0    
Nickel West,                                                                    
Australia                                                                       
Production                                                                      
Nickel contained in                                                             
concentrate                   0.9    1.7    1.6    3.3    2.6    2.6    0.9     
Nickel contained in                                                             
finished matte                13.6   21.8   12.4   16.1   9.0    9.0    13.6    
Nickel metal                                                                    
                              11.6   7.1    11.2   11.4   13.1   13.1   11.6    
Nickel production                                                               
                              26.1   30.6   25.2   30.8   24.7   24.7   26.1    
Sales                                                                           
Nickel contained in                                                             
concentrate                   1.6    0.8    2.2    3.9    1.2    1.2    1.6     
Nickel contained in                                                             
finished matte                14.6   19.9   14.7   14.9   10.1   10.1   14.6    
Nickel metal                                                                    
                              12.2   9.6    9.2    12.4   9.4    9.4    12.2    
Nickel sales                                                                    
28.4   30.3   26.1   31.2   20.7   20.7   28.4    
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                         QUARTER ENDED                         YEAR TO DATE     
SEP     DEC    MAR     JUN     SEP    SEP     SEP      
                         2010    2010   2011    2011    2011   2011    2010     
IRON ORE                                                                        
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
IRON ORE (a)                                                                    
Pilbara, Australia                                                              
Production                                                                      
Newman (b)                                                                      
                         9,640   11,213 11,912  12,480  13,158 13,158  9,640    
Goldsworthy Joint                                                               
Venture                  384     225    305     284     254    254     384      
Area C Joint                                                                    
Venture                  10,086  10,154 9,510   10,044  10,479 10,479  10,086   
Yandi Joint                                                                     
Venture                  8,787   9,078  8,799   9,796   12,708 12,708  8,787    
Total (BHP                                                                      
Billiton share)          28,897  30,670 30,526  32,604  36,599 36,599  28,897   
Total production                                                                
(100%)                   33,996  36,082 35,913  38,358  43,058 43,058  33,996   
Shipments                                                                       
Lump                                                                            
                         7,822   7,830  7,669   7,463   7,744  7,744   7,822    
Fines                                                                           
21,049  23,870 22,648  25,379  29,311 29,311  21,049   
Total (BHP                                                                      
Billiton share)          28,871  31,700 30,317  32,842  37,055 37,055  28,871   
Total sales                                                                     
(100%)                   33,966  37,294 35,667  38,638  43,594 43,594  33,966   
(a)  Iron ore production and shipments are reported on a wet tonnes basis.      
(b)  Newman includes Mt Newman Joint Venture and Jimblebar.                     
Samarco, Brazil                                                                 
Production                                                                      
                         3,086   2,996  2,705   2,922   2,973  2,973   3,086    
Shipments                                                                       
                         2,634   3,460  2,598   2,736   2,926  2,926   2,634    
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
                              QUARTER ENDED                      YEAR TO DATE   
                              SEP    DEC    MAR    JUN    SEP    SEP    SEP     
2010   2010   2011   2011   2011   2011   2010    
MANGANESE                                                                       
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
MANGANESE ORE                                                                   
South Africa (a)                                                                
Saleable production                                                             
                              938    779    514    776    911    911    938     
Sales                                                                           
                              657    947    701    746    861    861    657     
Australia (a)                                                                   
Saleable production                                                             
1,184  1,050  838    1,014  1,108  1,108  1,184   
Sales                                                                           
                              552    1,173  1,127  1,108  1,094  1,094  552     
MANGANESE ALLOY                                                                 
South Africa (a) (b)                                                            
Saleable production                                                             
                              132    123    111    120    124    124    132     
Sales                                                                           
95     153    145    123    95     95     95      
Australia (a)                                                                   
Saleable production                                                             
                              67     69     61     70     70     70     67      
Sales                                                                           
                              53     68     62     75     91     91     53      
(a) Shown on 100% basis.  BHP Billiton interest in saleable production is 60%.  
(b) Production includes Medium Carbon Ferro Manganese.                          
PRODUCTION AND SHIPMENT REPORT                                                  
                               QUARTER ENDED                     YEAR TO DATE   
                               SEP    DEC    MAR    JUN   SEP    SEP    SEP     
                               2010   2010   2011   2011  2011   2011   2010    
METALLURGICAL COAL                                                              
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
METALLURGICAL COAL (a)                                                          
Queensland, Australia                                                           
Production                                                                      
BMA                                                                             
Blackwater                                                                      
1,458  1,134  870    1,127 1,367  1,367  1,458   
Goonyella                                                                       
                               1,863  1,086  993    1,417 1,463  1,463  1,863   
Peak Downs                                                                      
1,117  984    758    543   971    971    1,117   
Saraji                                                                          
                               872    819    532    556   802    802    872     
Norwich Park                                                                    
468    73     128    386   365    365    468     
Gregory Joint Venture                                                           
                               760    438    674    845   306    306    760     
BMA total                                                                       
6,538  4,534  3,955  4,874 5,274  5,274  6,538   
BHP Mitsui Coal (b)                                                             
South Walker Creek                                                              
                               1,056  765    623    690   1,106  1,106  1,056   
Poitrel                                                                         
                               857    656    510    736   697    697    857     
BHP Mitsui Coal total                                                           
                               1,913  1,421  1,133  1,426 1,803  1,803  1,913   
Queensland total                                                                
                               8,451  5,955  5,088  6,300 7,077  7,077  8,451   
Shipments                                                                       
Coking coal                                                                     
6,641  5,243  3,475  4,865 5,066  5,066  6,641   
Weak coking coal                                                                
                               1,653  1,886  970    1,411 1,691  1,691  1,653   
Thermal coal                                                                    
368    206    125    285   176    176    368     
Total                                                                           
                               8,662  7,335  4,570  6,561 6,933  6,933  8,662   
(a)  Metallurgical coal production is reported on the basis of saleable         
product.  Production figures include some thermal coal.                    
(b)  Shown on 100% basis.  BHP Billiton interest in saleable production is      
     80%.                                                                       
Illawarra, Australia                                                            
Production                                                                      
                               1,848  1,832  1,582  1,622 2,214  2,214  1,848   
                                                                                
Shipments                                                                       
Coking coal                                                                     
                               1,388  1,495  1,374  1,407 1,673  1,673  1,388   
Thermal coal                                                                    
                               362    536    211    216   159    159    362     
Total                                                                           
                               1,750  2,031  1,585  1,623 1,832  1,832  1,750   
PRODUCTION AND SHIPMENT                                                         
REPORT                                                                          
QUARTER ENDED                      YEAR TO DATE   
                              SEP    DEC    MAR    JUN    SEP    SEP    SEP     
                              2010   2010   2011   2011   2011   2011   2010    
ENERGY COAL                                                                     
BHP Billiton attributable production and sales unless otherwise stated.         
(`000 tonnes)                                                                   
South Africa                                                                    
Production                                                                      
8,997  8,507  8,596  8,228  9,095  9,095  8,997   
Sales                                                                           
Export                                                                          
                              3,047  3,365  2,887  3,082  3,439  3,439  3,047   
Local utility                                                                   
                              5,667  5,024  5,254  5,363  5,622  5,622  5,667   
Inland                                                                          
                              110    96     78     37     85     85     110     
Total                                                                           
                              8,824  8,485  8,219  8,482  9,146  9,146  8,824   
New Mexico, USA                                                                 
Production                                                                      
Navajo Coal                                                                     
                              1,754  1,818  1,629  2,271  1,178  1,178  1,754   
San Juan Coal                                                                   
                              1,423  478    731    1,508  1,289  1,289  1,423   
Total                                                                           
                              3,177  2,296  2,360  3,779  2,467  2,467  3,177   
Sales - local                                                                   
utility                       3,361  3,339  3,385  3,106  3,630  3,630  3,361   
NSW Energy Coal,                                                                
Australia                                                                       
Production                                                                      
                              2,506  3,394  3,978  3,793  4,046  4,046  2,506   
Sales                                                                           
Export                                                                          
                              2,626  3,253  3,824  3,522  3,523  3,523  2,626   
Inland                                                                          
404    180    339    364    625    625    404     
Total                                                                           
                              3,030  3,433  4,163  3,886  4,148  4,148  3,030   
Cerrejon Coal,                                                                  
Colombia                                                                        
Production                                                                      
                              2,426  2,316  2,609  2,538  2,852  2,852  2,426   
Sales - export                                                                  
2,776  2,672  2,149  2,853  2,901  2,901  2,776   
Date: 19/10/2011 07:05:57 Produced by the JSE SENS Department.                  
The SENS service is an information dissemination service administered by the    
JSE Limited (`JSE`). The JSE does not, whether expressly, tacitly or            
implicitly, represent, warrant or in any way guarantee the truth, accuracy or   
completeness of the information published on SENS. The JSE, their officers,     
employees and agents accept no liability for (or in respect of) any direct,     
indirect, incidental or consequential loss or damage of any kind or nature,     
howsoever arising, from the use of SENS or the use of, or reliance on,          
information disseminated through SENS.